Our Bad Entertainment home
Roguelike deckbuilder · In playtesting

Chronogrid 2050

It's 2050, and the energy grid is haunted. Build solar, wind and batteries into a working grid while you fight the ghosts of the old system across a seeded, branching map. Every run is a new test of whether your grid can hold.

Our bad: the grid has ghosts now.

In playtesting now

Want in on a future playtest? Email look@ourbadentertainment.com.

Chronogrid: 2050 battle: a grid of solar, wind, gas and battery cards faces the monsters Ember Warden and Phantom Peak, with a hand of cards below
Ember Warden and Phantom Peak, Desert and Mountain West

About Chronogrid: 2050

Chronogrid: 2050 is a roguelike deckbuilder set on the power grid of the near future. Your deck is your generation: utility solar, community wind, grid batteries, gas peakers, demand response and the deals that get them built. Every card you play is a megawatt you have to keep online.

The trouble is that the old grid doesn't go quietly. Its ghosts haunt every region you cross, from Ember Warden and Phantom Peak to the Outage Poltergeist, the Red-Tape Eater and the Cost Overrun Specter. Each run takes you along a seeded, branching route of fights, build sites and shops, ending at the Paradox.

Features

  • Build the grid you fight with

    Solar, wind, storage and thermal assets go onto your grid and into your deck. Capacity, storage and ramping all matter once the load starts rising.

  • Ghosts of the old system

    Echoes, Anomaly elites, section mini-bosses and the Paradox itself, each with its own way of draining, blocking or overloading your grid.

  • A new route every run

    A seeded, branching map across US regions like the Pacific Northwest, the Northeast and the Desert and Mountain West.

  • Four leads, four ways to play

    Start as the Developer, the Financier, the Project Manager or the CEO, each with their own starting deck and strengths.

  • Spend your spare megawatts

    Before big fights, Readiness lets you trade spare MW for crew rest, emergency repairs, a hardened grid or an overclocked opening.

  • Build sites and procurement

    Commission new assets at Build Sites, shop the Procurement Office, and salvage what you can from Decommissioned Plants.

Screenshots and art

At a glance

Genre
Roguelike deckbuilder
Players
1 (co-op and PvP in design)
Setting
The US power grid, 2050
Status
In playtesting
Platform
To be announced

In playtesting now

Want in on a future playtest? Email look@ourbadentertainment.com.

Writing about Chronogrid: 2050? Grab screenshots and logos from the press kit.

More from Our Bad